The Saudi Building Code 2024 energy-conservation provisions make metered, controlled energy use a design requirement; a commissioned building-management system is where that requirement is proven.
Testing and labelling
Structured cabling is where a low-current package is won or lost. Every copper and fibre link is tested to the parameters the specification sets, labelled at both ends to one scheme agreed before the first cable is pulled, and recorded against its link identifier, its date and its result. A link with no test record is not a finished link.
The open-protocol position
BACnet · Modbus · KNX · MQTT
We build on open protocols — BACnet, Modbus, KNX and MQTT — and we are tied to no manufacturer: we hold no manufacturer accreditation and will not print one. The brands we work with are listed on their own page, for orientation. Where your specification requires a manufacturer's accredited installer, we say so at tender and coordinate that scope with a specialist who holds it. What you are left holding is a system another contractor could extend, re-tender or maintain.
The division's installed scope sits in one family of the company's commercial registration — eight of the 101 registered activities, printed here so you can check them against your package before you invite us. The fire-alarm interface sits in a ninth code in another family, and is integration only.
| Code | Registered activity |
|---|
| 432111 | Electrical wiring |
| 432112 | Telecom wiring |
| 432113 | Network wiring |
| 432121 | TV and satellite networks |
| 432122 | Computer and telecom networks |
| 432131 | Lighting systems |
| 432134 | Security devices — installation and maintenance |
| 432135 | Traffic-safety devices |
At handover you get one dossier, not six: as-builts, test records, points lists, credentials and training, issued once by the division that installed the work.