The physical fabric of a project — foundations, envelope, finishes and external works.

The division

Civil & Architecture carries the physical fabric of a project, from foundations to final finishes.

It is a permanent division in a matrix organisation: it owns the engineers and the standards, and lends them to the project team that needs them. It is designed as the company's largest capability centre — on a turnkey package it is built to carry the largest scope and lead the site sequence — with its own discipline leads, profit and loss and business development. Four sub-divisions cover structure, fit-out, façade and external works, and every scope line on this page is an activity registered on the commercial registration. Send us the tender drawings and bill of quantities; you get a priced package with one name accountable for it.

4 sub-divisions

Core & Shell · Fit-out · Façade · Infrastructure / External Works.

22 registered finishing activities

Building completion, fit-out and finishing is the largest single family of the 101 registered activities.

The lead on a turnkey package

Designed to carry the largest scope and to lead the site sequence.

Four sub-divisions, one site team

The four sub-divisions are permanent: each holds the engineers, the method statements and the supply chain for its stage of the building, and each is lent to a project team for the length of a package. Every scope line below is an activity registered on the commercial registration.

Core & Shell

Foundations, frames and slabs — the structure everything else hangs on. Set out from the survey, poured against hold points, and inspected before the next stage may start.

Registered families A · E · I · J

  • Reinforced-concrete structures, frames, slabs and foundations
  • Excavation, grading, foundation casting and groundwater dewatering
  • Residential, non-residential and government buildings; on-site prefabricated buildings
  • Renovation of existing residential and non-residential buildings
  • Masonry in brick, block and stone
  • Metal frames, railings and stairs — installation only; pre-stressed concrete units

Fit-out

The interior, from the first partition to the final coat of paint. 22 registered activities sit in this stage, which is why it is priced line by line.

Registered family I — 22 codes

  • Partitions, suspended ceilings and timber wall cladding
  • Joinery in wood, aluminium and metal — doors, windows, frames, stairs and kitchens
  • Plaster, paint, wallpaper and decorative finishes
  • Microcement, epoxy, rubber, linoleum and plastic floors
  • Ceramic, marble, stone and parquet flooring; tile and marble polishing
  • Furniture installation and the interior fitting-out of shops and mobile buildings

Façade

The envelope: stone, cladding, glazing and the insulation behind them. The layer that keeps water and heat out, so its details are agreed before the structure closes.

Registered families H · I · J

  • Stone and cladding systems, laid and dressed to the façade line
  • Tower-façade glazing, glass and mirrors
  • Thermal and water insulation behind the envelope
  • Exterior painting and protective coatings to engineering structures
  • Roof tiling
  • Shades and awnings

Infrastructure / External Works

Everything outside the building line, from the first cut to handover cleaning. It opens the site before the structure starts and closes it after the finishes are done.

Registered families E · I · J

  • Site preparation: excavation, grading and levelling
  • Rock cutting and demolition
  • Groundwater drawdown and dewatering
  • Swimming pools
  • Site masonry in brick and stone — boundary walls and hardscape
  • Scaffolding, sandblasting and post-construction cleaning at handover

The code we build to, and the register we build from

The Saudi Building Code 2024 is the design and inspection reference on every package. It replaced the previous edition and became mandatory across the Kingdom on 30 June 2025, after a transitional period. Registration with the Saudi Council of Engineers is a condition of every engineering seat in the division's design.

The division draws on five of the twelve activity families on the commercial registration: A — general building construction, from residential and non-residential buildings to government buildings and renovation; E — demolition and site preparation, including foundation casting and dewatering; H — thermal and water insulation; I — building completion, fit-out and finishing, 22 codes and the largest single family on the register; and J — other specialised construction: brick and stone laying, scaffolding, swimming pools and pre-stressed concrete units.

What we do not offer: steel fabrication is a manufacturing activity and is not on the commercial registration. Structural steel and metalwork are quoted as installation only, against a fabricator's supply.

Interfaces are set out before they are buried. Sleeves, builder's work openings and plant-room plinths are agreed with the MEP Division before the pour; containment routes, back-boxes and device positions with the ELV Division before the ceilings close. On a turnkey package the divisions are priced together, on one bill of quantities.

DIVISION 01 · FACILITY MANAGEMENT

Facility management

The facility-management section takes a building on after handover and keeps it working: planned maintenance of the fabric and the building services, corrective repairs closed against a response time agreed in writing, and one point of contact for the owner. Its scope is the activities on the company's commercial registration — renovation, heating and air-conditioning maintenance, security-device maintenance, insulation, central cleaning systems, post-construction and façade cleaning — with the Civil division's own trades on call for anything the fabric needs.

Planned maintenance

A maintenance plan per asset — fabric, finishes, HVAC, plumbing, electrical — with inspection intervals and a record for every visit.

Registered families F · G

  • Asset register for each building
  • Heating and air-conditioning maintenance
  • Security-device maintenance
  • Documented inspection rounds

Repairs and response

Faults reported through one channel, classified by urgency and closed against the response time agreed in the contract.

Registered families A · I

  • One reporting channel
  • Priorities and a written response time
  • A close-out report for every call

Fabric and finishes

Renovation, repainting, tiling, joinery, insulation and waterproofing — the Civil division's own trades, on call.

Registered families A · H · I

  • Renovation of existing buildings
  • Interior and exterior painting
  • Tile and marble polishing
  • Thermal and water insulation

Cleaning and support services

The cleaning activities the registration carries, delivered under the same plan and the same records.

Registered families H · I · J

  • Central cleaning systems
  • Post-construction cleaning
  • Steam cleaning and sandblasting of façades

Send us the building's drawings and its asset list; the reply is a priced maintenance plan and a written response time.

Office and industrial building

Past projects

These projects were delivered by our team's engineers and crews over their careers, before Engineering Horizon was registered. The photographs are from their own records.

DIVISION 01 · VINYL FLOORING WORKS

Vinyl flooring works

Vinyl flooring across four building types — administrative, healthcare, entertainment and residential. Open a project to step through its photos.

Send us the tender drawings and bill of quantities

You get a priced package with one name accountable for it.

Talk to us